118 mts LOA Cargo Vessel called “Ezaro”

Dry docking for repair and maintenance works Washing, sand-blasting and painting of the hull, hold and lid hatches, renew joints and supports lid hatches, change cathodic protection, check clearances rudder and check shaft line, check the valves, renew rubber lid...

58 m LOA Tug-Boat “Alonso de Chaves”

Dry docking for repair and maintenance works Washing, sand blasting, painting, change cathodic protection, check clearances rudder and check shaft line, disassemble and assemble bottom plugs, checking, calibration, pressure cleaning, lower and extension of chains and...